Examples of MBL Main Contractor projects
As a main contractor, we ensure that each project is realised with the highest attention to detail to deliver stunning results. Our case studies and testimonials speak for themselves.
Comprehensive refurbishment and extension of a private 7-bedroom residence in Moor Park, Hertfordshire.
Full refurbishment and transformation of a 16th-century church into a modern Special Educational Needs (SEN) school.
Full refurbishment and re-cladding of Brunswick Apartments, a prominent 11-storey student accommodation building in Southampton.
Michael Brady Ltd was appointed as Principal Contractor by Frogmore for the full refurbishment and Cat A & Cat B fit-out of three Georgian-style townhouses in Holborn.
We were appointed as the Main Contractor to build the new training ground for QPR FC. The building was constructed with a hybrid modern Steel Frame and exposed timber, and concrete decks to both first floor and mezzanine floor levels.
Michael Brady Ltd transformed a 30,000 Sq foot office building into a luxury care home facility specialising in dementia.
Michael Brady Ltd were appointed to undertake CAT B fit-outs on a fast track 9-week programme to create Furnished Education Facilities as well as Offices for the London Ambulance Service Estate NHS Trust.
Exquisite renovation of historic Grade II listed building into luxury commercial premises
iQ student accomodation refurbishment and vertical extension reach new heights
For more information please call us on (020) 8900 2345 or send us a message below.
I would like to opt in to receive marketing communications via: